October 4, 2020 | AutomotiveMaterial FlowOptimisationWarehouse Design

Case Study – Material Flow Optimisation

One of the top 5 passenger car manufacturers in the World with revenues over $130 billion in 2019 and employing over 80,000 employees in North America.

A globally-renowned automotive OEM’s largest logistics centre needed assistance in optimising their supply chain. The facility consisted of over one million SQ. FT. of warehouse space and over three million parts. TVS SCS was brought in to evaluate and streamline the entire process.

By transitioning from a flow-through design to a U-shaped design, TVS SCS was able to optimise material flow within the customers’ logistics centre. Thus, reducing the travel distance of the commodities, leading to optimised labour utilisation and an increase in overall operational efficiency.

To read about our full solution for the customer, please download the full case study below.

Download full case study
POSTED ON October 4, 2020